KazTransOil reports on progress of work on ensuring reliable and safe operation of facilities

04.11.19 14:51
/KASE, November 4, 2019/ – KazTransoil (Nur-Sultan), whose shares are officially listed on Kazakhstan Stock Exchange (KASE), has provided KASE with the following press release dated November 4, 2019: quote "KazTransOil" JSC, implementing the program for ensuring reliable and safe operation of production facilities eliminated 1105 defects of the main oil trunk pipeline during January-September of 2019. The defects to be repaired were identified in 2014-2018 as a result of in-line diagnostics on the sections of the main oil trunk pipelines "Zhanazhol-Kenkiyak", "Alibekmola-Kenkiyak", "Kenkiyak-Orsk", "Uzen-Atyrau-Samara", "Martyshi - Atyrau", "T. Kasymov NPS - NPS "663km" - ANPZ", "NPS "663km" – ANPZ", "Komsomolsk-Makat", "Prorva-Kulsary", "NPS-3 - Kosshagyl", "Uzen – Zhetybay-Aktau" (2 - line), "Kalamkas – Karazhanbas – Aktau", "Northern Buzachi-Karazhanbas", "Kumkol-Karakoin" D530mm, "Kumkol-Karakoin" D720mm, "Kumkol-Karakoin" D820mm, "Pavlodar-Shymkent", "Omsk-Pavlodar". "In particular, two segments with defects were cut out and the linear valve of the oil pipeline was replaced at the Head Oil Pump Station (HOPS) of "Pavlodar" – HOPS "Atasu" section of "Pavlodar-Shymkent" main oil pipeline. A temporary repair structure was cut out and a plunger valve was conserved at the technological section HOPS "Atasu" - HOPS "Dzhumagaliev" of "Pavlodar-Shymkent" main oil pipeline," - commented Sabit Arynov, Deputy General Director of "KazTransOil" JSC. unquote The full press release is available on KASE website: - http://kase.kz/files/emitters/KZTO/kzto_reliz_041119_kz.pdf – in Kazakh; - http://kase.kz/files/emitters/KZTO/kzto_reliz_041119_1.pdf – in Russian; - http://kase.kz/files/emitters/KZTO/kzto_reliz_041119_eng_1.pdf – in English. [2019-11-04]