KazTransOil announces completing part of work on capital repair of Kazakhstan section of oil pipeline TON-2
30.10.15 17:19
/KASE, October 30, 15/ – KazTransOil JSC (Astana), whose shares are officially
listed on Kazakhstan Stock Exchange (KASE), has provided KASE with the following
press-release:
quote
"KazTransOil" JSC informs about the completion of scheduled for 2015 work on
selective replacement of 57.6 km of Kazakhstani section of "Tuimazy – Omsk –
Novosibirsk – 2" oil pipeline (TON-2). The overhaul on selected sections of the
pipeline was conducted by "Akniet-BN" LLP in accordance with the schedule. The
cost of the completed in 2015 overhaul made KZT 12 billion.
Overhaul of TON-2 is conducted to ensure the reliable transportation of 7
MMT/year of crude oil by Kazakhstani section of TON-2 pipeline, including
Russian oil designated for further transit transportation to China via the
territory of the Republic of Kazakhstan using "Omsk – Priirtyshsk – Atasu –
Alashankou" route in accordance with the Agreement between the Governments of
the Republic of Kazakhstan and the Russian Federation on cooperation in the
field of Russian crude oil transportation via the territory of the Republic of
Kazakhstan to the Peoples Republic of China.
Overhaul of selected sections of TON-2 oil pipeline has started in 2014, when
the sections of the pipeline with a total length of 40 km were replaced. CAPEX
for 2014 totaled KZT 5.3 billion. The throughput capacity of TON-2 oil pipeline
increased up to 10 million tons per year after the completion of construction
work, which were scheduled for 2014 and 2015.
The whole project of overhaul includes the replacement of 185.6 km of TON-2
Kazakhstani section.
unquote
[2015-10-30]